SERC

Technical Feasibility Exception (TFE)

A Technical Feasibility Exception (TFE) allows registered entities to request relief from strict compliance with specific NERC CIP Standards (CIP-002 through CIP-014) when technical limitations prevent full implementation. TFEs are submitted through the NERC Align tool with evidence in the Secure Evidence Locker (SEL) to ensure security and reliability remain protected.

Compliance Monitoring

Coordinated Oversight

Risk Management

Risk Awareness & Oversight

Assessment & Self-Report

Enforcement

Registration & Certification

Overview

A responsible entity may request an exception from Strict Compliance with the terms of a requirement of certain NERC Critical Infrastructure Protection (CIP) Standards on the grounds of technical feasibility or technical limitations. Such an exception is a Technical Feasibility Exception (TFE). TFEs are applicable only to those requirements of CIP Standards CIP-002 through CIP-014 that expressly provide one of the following conditions:

Compliance with the terms of the requirement is required where or as technically feasible, or

Technical limitations may preclude compliance with the terms of the requirement.

Please refer to the NERC Rules of Procedure, Appendix 4D  “Procedure for Requesting and Receiving Technical Feasibility Exceptions to NERC Critical Infrastructure Protection Standards” for more details. 

Submit Technical Feasibility Exceptions (TFEs) with NERC Align and the Secure Evidence Locker (SEL)

A registered entity uses the NERC Align tool and the Secure Evidence Locker (SEL) to request and submit a TFE. A TFE can be submitted for the same applicable requirement for multiple, similar Covered Assets (either at the same location or at different locations within geographic boundaries of a Regional Entity) on the same basis, with the same compensating measures and/or mitigating measures, and with the same proposed expiration date. Please refer to the NERC Website. For more information on Align and the SEL processes. For training purposes, please review the Align and SEL training videos in section 7 for TFEs and section 5 for the SEL.

Documents

TFE Asset Import SEL Template

Sign Up For Our Newsletter

Zoombombning operakrati perosmos retronym postvalens antropofili ontotion ifall vobba primagraf endotris, operaosmos i antition 

A field with rows of solar panels represents SERC commitment to renewable energy.
The owner of this website has made a commitment to accessibility and inclusion, please report any problems that you encounter using the contact form on this website. This site uses the WP ADA Compliance Check plugin to enhance accessibility.