Reliability Review Subcommittee

The SERC Engineering Committee Reliability Review Subcommittee reviews, assesses, and reports on the overall reliability (adequacy and security) of bulk power systems, both existing and as planned, to promote compliance of the region and each SERC Registered Entity with applicable NERC Reliability Standards, as well as the related SERC Regional Criteria.

Additionally, the Resource Review Subcommittee develops the Regional supplements to the NERC Long Term Reliability Assessment study and Seasonal Assessments.

Standards Committee

Engineering Committee

Ops, Planning & Security Executive Committee

Operating Committee

Critical Infrastructure Protection Committee

Eligibility For Membership

Each SERC subregion is entitled to one representative and a maximum of two alternates. Each Reliability Review Subcommittee member company must be registered as a Transmission Planner (TP) or Planning Coordinator (PC).

  1. SERC Central
  2. SERC East
  3. SERC Southeast
  4. SERC Florida Peninsula
  5. SERC MISO Central
  6. SERC MISO South
  7. SERC PJM

RRS members cannot be marketing function employees as defined by Federal Energy Regulatory Commission (FERC) regulations and the FERC Standards of Conduct, and must be signatories to the SERC confidentiality agreement.

Please review the Reliability Review Subcommittee’s scope document for additional eligibility requirements. To be considered for joining a committee or to update a current committee roster.

For more information on SERC Technical Committees, please see the Organization and Procedure Manual for SERC Technical Committees.

SERC Primary Staff

Mark Kuras 
Chair 
PJM Interconnection, LLC 

Heather Polzin
SERC Primary Staff Support
SERC Reliability Corporation

Bart White
Vice Chair
Duke Energy Florida, LLC

Upcoming Events

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.Lorem 

Placeholder Image

Committee Documents

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.Lorem 

Related NERC Committees

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.Lorem 

Sign Up For Our Newsletter

Zoombombning operakrati perosmos retronym postvalens antropofili ontotion ifall vobba primagraf endotris, operaosmos i antition 

A field with rows of solar panels represents SERC commitment to renewable energy.

Title

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.Lorem 

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.Lorem 

Resource Adequacy Working Group

Long-Term Working Group

Near-Term Working Group

Dynamics Working Group

Short Circuit Database Working Group

Geomagnetic Disturbance Working Group

Reliability Review Subcommittee

Planning Coordination Subcommittee

Variable Energy Resources Working Group

Protection & Control Working Group

The owner of this website has made a commitment to accessibility and inclusion, please report any problems that you encounter using the contact form on this website. This site uses the WP ADA Compliance Check plugin to enhance accessibility.